Capital Project 2024

On December 7, 2021, LCSD voters authorized a tax-neutral capital improvement bond to support the 2024 Capital Project. This district-wide, long-term facilities plan has been designed to enhance safety and security, upgrade teaching and learning spaces, and improve infrastructure at all LCSD schools. Construction of the capital project will be completed in multiple phases over the course of multiple years.

On February 15, 2022, LCSD voters approved the Capital Project Resolution to develop the Saunders' Sports Complex at LCSD. Mr. Saunders committed $1 million to support the project and limit the tax impact.

May 2024

Phase 1 - Bus Garage

Site work continued with fence installation along the East and North sides of the site. Poured pads for the entry and exit gates in the parking lot. Completed topsoiling and grading. Continued installing hardware for wooden doors. Installed bollard covers on bollards along the north and south walkways of the building. Pressure washed the sidewalks around the building. Completed installation of the emergency eyewash and emergency shower. Completed the installation of the handwash in the maintenance bay. Completed exterior lighting. The bus wash start-up and testing will take place within the next 2 weeks. Filtrec completed the installation of the twin post lift. All lifts are completed.

The anticipated move-in date for the new Transportation facility is July 1, 2024.

Exterior lights completed.

Twin post lift installed.

Emergency eyewash and shower.

Phase II - Field and Main Office

Removed light pole bases from site. Demolished the existing sanitary line. Began the first backfill lifts on site. Removed existing storm structures on the southeast side of site. Began the demolition of the pre-cast panels at the high school. Began laying out walls for the new main office. Set toilet carriers on both sides of the Field House. Continued roughing in sanitary piping in the Field House. Installed hot water supply and return lines in the Field House on the women's side. Continued boiler room layout at the Field House. Continued working on the 4" rigid conduit at the mechanical room. Continued roughing into the toilet rooms in the high school.

Upper field fine grading.

Concrete wall was removed for the new main entrance.

New toilet rooms roughed in.

April 2024

Phase 1 - Bus Garage

This week electrical worked with National Grid to energize the building. Bus wash equipment installation continues with a targeted completion in 2 weeks.

The anticipated move-in date for the new Transportation facility is July 1, 2024.

Office area ceiling tiles were installed and the area was cleaned up to prep for floor work.

Plumbing work continues on the fluid reels and storage tank.

Site work continues with work on the asphalt binder and sidewalk.

Phase II - Field and Main Office

Site work on new waterline along the eastern side of the site to replace the existing line that would be under the field. Demolition on the new main entrance and field house continues. Plumbing with under slab piping to new auditorium toilet rooms. Work on field house boiler room. Electrical work removing and rerouting conduit and wiring from within the new main office vestibule.

Field House demolition.

New Main Office work at auditorium entrance.

Site work for new turf field.

March 2024

Phase two of the capital project is underway and will continue through early Fall 2025. 

Revised Staging Area:

Due to unforeseen circumstances, the contractor staging area originally planned for the space along Bulldog Boulevard has been relocated to the softball field parking lot at the end of Branch Street and a portion of the Southeast corner of the High School parking lot. The softball parking lot at the end of Branch Street will be shared with the construction staging and the school athletic teams for the duration of the capital project.  Additional parking for the softball field and pickleball court remains available around the Connell Building on Spring St. and School Street and at the Elementary School.

Middle/High School Auditorium Entrance:

This entrance near the auditorium will be closed beginning Monday, April 1, 2024 and continue until that portion of the project is completed.  All staff and students should use the main entrance doors to enter the building during the school day. After school activities and after school visitors for events or continuing education may use the Middle School main entrance.

Interior Middle/High School Work:

Interior work will begin on March 29, 2024 and continue until that portion of the project is completed.  During Spring recess, there will be a significant amount of demolition work with noise disruption to those who may be in the building. 

Contact rcarll@livoniacsd.org if you have any questions.

Revised Staging Area
MHS Construction

Phase 2 starting March 18th, 2024

Phase two of the capital project will consist of several updates including classroom and bathroom renovations, a new Middle/High School main entrance, and a multi-purpose turf field and athletic complex.

The site contractor will begin establishing the staging area along Bulldog Boulevard and fencing off the construction perimeter for the turf project. Once the fencing is installed, they will begin some selective demolition. Therefore, the fields and sidewalk behind the field house will be closed until approximately December 2024.

Please use extra caution as you visit campus this Spring.

  • Some of our Spring sports teams will be relocated during the construction.

  • Please use caution when driving as our athletes may be walking to their relocated practice area.

  • Please use caution when driving or walking as there may be construction vehicles entering/exiting the construction service road to the North of Saunders Field (behind the football field scoreboard).

  • Students and athletes should use the sidewalk on Bulldog Boulevard to walk between the Middle/High School and the Elementary School.

  • The field house will be closed.

  • The concession stand will have limited, pre-approved use.

Contact rcarll@livoniacsd.org if you have any questions.

Thank you in advance for your patience and flexibility as we continue this capital improvement project through Fall 2025.